Applications

Scalable energy storage solutions powering homes, businesses, utilities and beyond — anywhere reliable energy matters

Zhejiang, China — 1 MWh Factory Peak Shaving
A 1 MWh rack-mount ESS cuts a precision parts factory's peak demand charges by 31% with two-cycle daily operation.

A precision parts factory in Zhejiang faced peak demand charges of CNY 120,000 per month and repeated voltage dips that damaged CNC controllers. A 1 MWh rack-mount ESS with cloud EMS was deployed to shave peaks and smooth supply.

Key Features

  • Peak demand charges reduced by 31%

  • Two full charge-discharge cycles per day

  • Voltage dips eliminated — CNC downtime down 90%

  • Project payback achieved in 3.8 years

Request a quote and our team will send you the full specification sheet, test reports and free samples.